Theresienbrücke, Füssen

client City of Füssen

As part of the structural diagnostics, durability and traffic safety deficiencies were identified, particularly due to leaky transition structures and the drainage systems underneath, which led to the damaging chloride contamination of the structure. The renovation measures included replacing the bearings in the affected area, renewing the transition structures and repairing the main components of the bridge superstructure. The sealing was also renewed, which included renewal of the surface covering and the caps. Following the demolition work, the entire drainage system was renewed.