client City of Kempten
The implementation of the project took place in a listed building. As well as the overall renovation of the school building, a new sports hall with impressive modern architecture and functionality was also built. The hall is approximately 28.5 m long and 26 m wide, with a reinforced concrete canopy that covers the entire access area. There is an all-weather area on the roof of the hall, which is accessed via wide connecting walkways. The hall itself consists of reinforced concrete columns and prefabricated beams, whereas the adjacent two-storey ancillary area was predominantly built using reinforced concrete. The foundation was built on a flexibly bedded reinforced concrete floor slab.