Repair of the Neuschwanstein Marienbrücke

client State Building Authority, Kempten

The pedestrian bridge across the 90 metre deep Pöllath gorge is characterised by its special design. The half-timbered bridge, which was built in 1967, has a central normal force joint and a 50 metre span. It is frequented by large numbers of visitors every day. As part of this project, the bridge structure was statically checked in order to determine the load-bearing capacity and stability thereof. A static evaluation with regard to the framework housing was also issued.

Service portfolio

Project and structural design for bridge and engineering construction
Repair planning for existing buildings
Construction management and on-site construction monitoring