client Markt Babenhausen
Project planning and construction management for the new build of the Babenhausen bypass. The regional centre of Babenhausen is enclosed by National Highways St2017, St2020 and the B300 A-road. The junction of these axes lies in the town centre, and was previously the bottleneck of the traffic flows. With the new build of a connection between the B300 and the St2020, the traffic can be distributed outside of the town, which relieves the junctions and the municipality.