client Melsungen Municipal Works
Melsungen Municipal Works are planning to renovate their sewage treatment plant because of the excessive phosphor concentration in the waste water. In order to do this, several renovation concepts for extending the plant were examined. The renovation is intended to provide dual operation with a new aeration tank and new intermediate sedimentation tank. Specifically, this means the construction of an aeration tank with a volume of 1300 m³ and the construction of an intermediate sedimentation tank with a diameter of 24 metres. A new distribution structure is also going to be constructed to feed the two intermediate sedimentation tanks.