client DB Project Stuttgart-Ulm GmbH
As part of the reconstruction of the Stuttgart railway junction, the route of the Interregio curve will be re-routed and converted to a double track. To do this, a new flyover structure will be built in reinforced concrete, whilst retaining the existing route. The 89 m long structure consists of a continuous base slab and is subdivided with block joints in the frame structures. In order to secure the track area during the construction period, a bored pile wall with multiple rear anchors will be constructed.