client Lindau Horticultural and Civil Engineering Companies
Removal of the level crossing and grade-separated expansion of the crossing for non-motorized traffic on Bregenzer Straße in Lindau. A heavily frequented junction is going to be replanned for the processing and maintenance of all traffic conditions. The traffic conditions are to be reorganised, and the requirements of pedestrians and cyclists need to be upgraded. Because only short closure times are possible, the replanning must be oriented to rebuilding the junction while traffic is flowing. Special challenges are adjacent residential and commercial units and existing trees that need to be preserved. The entire section of Kolpingstraße to the Inselstraße roundabout including the bridges over Hundweilerstraße and Oberreitnauer Ach is also going to be modified.