client State Building Authority, Kempten
The flat foundation box girder bridge is characterised by having two separate superstructures which will be manufactured in prestressed concrete with both internal and external prestressing. The bridge will be manufactured using the incremental launching method, whereby an auxiliary support in the centre span will be used to make the launching procedure easier. With a total length of 254 metres and five spans, the structure presents itself as a impressive construction which is particularly impressive because of its modern design and efficient launch planning.