B10 Ulm

client City of Ulm

The axis of the B 10 in Ulm with its enormous traffic load is extremely important as a traffic artery, both locally and regionally. During the renewal of the B 10, the traffic connections on the Blaubeurer-Tor-Ring will be reorganised, and numerous structures will be replaced. Important constituents of the project are the replacement new build of the Wallstraßen bridge and the new build of the tunnel beneath the Blaubeurer Tor, each of which is about 200m long. The implementation of the project shall take place in a partnership processing model in which the implementing company, the general planner and the property owner will jointly develop the planning.

Service portfolio

Project control and management
Placement advice
Repair planning for existing buildings
Transport system project planning
Project and structural design for bridge and engineering construction
Integrated processing of infrastructure projects
Integrated property developer representation
B10 Ulm Drohnenaufnahme
B10 Ulm Drohnenaufnahme
B10 Ulm Vogelperspektive
View vacancies