The bridge structure crosses the Bundesstraße 10 and the high speed section Ulm - Augsburg near Burgau at an angle of approximately 100 degrees. The comprehensive repair included the renewal of the concrete surfaces, the railings, the protection equipment and the caps and coverings. Seals, transition structures and bearings were renewed in order to optimise the durability and safety of the bridge.